Fluvial PDA EURO
VESSEL`S DETAILS
Date (leave blank if today):
Vessel`s name:
Flag:
Operation:
Capacity of self propelled vessel:
Engine Power (KW):
DWT:
Loading capacity of barge (1):
Loading capacity of barge (2):
Loading capacity of barge (3):
Loading capacity of barge (4):
Loading capacity of barge (5):
Loading capacity of barge (6):
Quantity of general cargo to be loaded/discharged:
Quantity of bulk cargo to be loaded/discharged:
Agency fee:
Tel/Mail/DHL/etc:
PORT DUES
Quay dues:
Berthing on Administration potoon (no. of days):
Road fee (no. of days):
In berth without operation (no. of days):
Fresh water and electrical power supply (1.7 EUR/CBM):
MANEUVERING AND SUPERVISION FEE
Supervision free on road and berth (no. of days):
Motor boat used (no.of hours):
Tug used for shifting in/from berth (no.of hours):
HARBOUT MASTER DUES
:
Leading traffic in/out harbour:
Arrival/depature formalities for self propelled vessels:
Arrival/depature formalities for barge vessels:
Provision supply:
Cash to master:
Observations:
Home
|
About Us
|
Crewing
|
Ship Agent
|
Shipchandlering
|
Links
|
Contact Us